The Sakti Solution™ · Contract Intelligence
Contractual Risk Evidence Engine
Contract information establishes the governing rule. Project records establish what occurred. A risk finding is generated only when an evidenced deviation can be tested against a controlling contractual requirement.
01 · Contract Information
Locked Rules
02 · Project Evidence
Not Assessed
03 · Deviation / Trigger
Not Established
04 · Risk Finding
Undetermined
A
Contract Information — Reference Layer
Reference parameters define the contractual test. They are not evidence that a risk event has occurred.
| Rule ID | Contract Parameter | Controlled Value / Requirement | Status |
|---|---|---|---|
| CRULE-01 | Time for Completion | 30 Sep 2026 — SIG/PSD LOA seed | LOCKED |
| CRULE-02 | Delay LD | RM33,405.57/day; application subject to the specified Key Dates | LOCKED |
| CRULE-03 | Service Disruption LD | RM30,000/hour where contractually attributable | LOCKED |
| CRULE-04 | Programme Requirement | Detailed schedule to conform to contractual Key Dates | LOCKED |
| CRULE-05 | Notice / Claims Mechanics | Project Conditions of Contract / Particular Conditions required | VERIFY |
B
Evidence Register — What Actually Happened?
| Evidence ID | Source | Observed Fact / Evidence State | Strength | Rule Link |
|---|---|---|---|---|
| E-001 | P6 XER | Await uploaded schedule evidence | UNVERIFIED | CRULE-01 / 04 |
| E-002 | MPR PDF | Await uploaded reported evidence | UNVERIFIED | Cross-check |
| E-003 | Notice / Correspondence | No contractual notice evidence loaded in current session | UNVERIFIED | CRULE-05 |
| E-004 | Approved EOT / Amendment | No controlled revision evidenced in current session | UNVERIFIED | CRULE-01 |
C
Evidence-to-Risk Matrix
| Risk ID | Evidence Trigger Required | Contract Test | Risk Output | Current Result |
|---|---|---|---|---|
| R-TIME-01 | P6 forecast exceeds locked completion date / applicable Key Date | Forecast vs contractual date | Completion / LD exposure | NOT TESTED |
| R-NOTICE-01 | Delay/change event + contractual notice record | Actual notice timing vs controlling clause | Notice / time-bar exposure | COC REQUIRED |
| R-EOT-01 | Employer-risk event + critical-path effect + EOT status | Risk allocation + causation + compliance | Entitlement preservation | UNVERIFIED |
| R-INT-01 | Interface dependency failure evidenced in P6/MPR | Responsibility vs actual constraint | Interface exposure | UNVERIFIED |
| R-CHANGE-01 | Instruction / scope delta + time or cost effect | Variation mechanism + authority + compliance | Recovery risk | UNVERIFIED |
| R-TC-01 | Testing / commissioning prerequisite delay | Responsibility + milestone dependency | RSD / completion exposure | UNVERIFIED |
D
Sakti Finding — Evidence Generated
No contractual-risk conclusion generated. Process project evidence first. Contract information alone does not constitute contractual risk.
E
Exposure & Required Action
| Finding | Exposure | Confidence | Required Action |
|---|---|---|---|
| No evidenced finding | Not calculated | 0% / Unverified | Process XER/MPR, then verify notices, EOTs and controlling clauses. |
Analytical control: Contract Information ≠ Evidence. Evidence ≠ Liability. Responsibility, entitlement and time-bar conclusions require the controlling contract, causation analysis and appropriate professional review.
RS
ROYAL SAKTI™
STRATEGIC ADVISORYPEOPLE
GOVERNANCE
INTELLIGENCE
PROTECTION
RECOVERY
GREATER VALUE
GOVERNANCE
INTELLIGENCE
PROTECTION
RECOVERY
GREATER VALUE
THE SAKTI SOLUTION™
RTS LINK
JOHOR BAHRU - SINGAPORE
ACTUAL STATUS ANALYSIS
EVIDENCE. INTERFACES. CERTAINTY.
"From complexity to certainty.
A more certain tomorrow."
- DEWI SAKTI
PROJECT VISUAL
Upload a verified project image in the calculator panel.
Upload a verified project image in the calculator panel.
ProjectRTS Link
Johor Bahru - Singapore
Johor Bahru - Singapore
TypeCross-border Rapid Transit System
LengthApprox. 4 km
Key StationsBukit Chagar / Woodlands North
Target RSD / Ops31 Dec 2026 / 1 Jan 2027
Key ObjectiveCross-border connectivity and growth
1
System Work Package Structure
BASED ON VERIFIED INPUT / LATEST DATA
| WPC | Scope | Status | Remarks |
|---|
Status is generated from the editable WPC register and should be validated against latest programme data.
2
Key Contractual Milestones
LATEST VERIFIED / CONTRACTUAL DATES
| No. | Milestone | Date |
|---|
3
Key Stakeholders
4
Infra - System Interface
Interface cutoff: 30 December 2025
5
Room Degree Finishes / Interface Readiness
TEMPLATE - ADAPT TO CONTRACTUAL DEFINITION
Category
Typical Rooms / Areas
Degree 1
Degree 2
Degree 3
A
Critical power, traction, battery and system rooms
Floor finishes; permanent doors; first coat
Second coat; raised floor; first and second fix
Final coat; works complete; site testing; cleaning & sealing
B
Communications, signalling, UPS, wash plant and maintenance areas
Floor finishes; temporary doors; first coat
Second coat; raised floor; first and second fix
Permanent doors; final coat; works complete; testing
C
Fare equipment, AFC and communication equipment rooms
Floor finishes; temporary doors; first coat
Second coat; raised floor; first and second fix
Final coat; all works; site testing; final cleaning
6
Overall Programme Status
INDICATIVE DECISION INTELLIGENCE
57%
Overall ProgressActual physical progressAT RISK
Schedule StatusSPI 0.88HIGH
Interface RiskCross-package dependenciesMONITOR
Cost StatusExposure under review7
Key Challenges
8
Schedule Snapshot
KEY DATES
Completed In Progress At Risk Not Started
9
The Sakti Solution™ Recommendations
10
Target Outcome
ON TRACK RSDTarget 31 Dec 2026
CONTROLLED COST & CLAIMSProtect capital
SUCCESSFUL INTEGRATIONSystems & testing readiness
SUSTAINABLE VALUEDecision confidence
CONNECTING PEOPLE.
POWERING TOMORROW.
POWERING TOMORROW.
Executive Capital Protection Snapshot
RM962.0M
TCV
73.8%
Entitlement coverage
RM146.5M
Unprotected exposure
RM2.57M
Gross LAD risk
85%
Defensibility
86/100
Executive score