RS

The Sakti Solution™

Authorised Calculator & Forensic Dashboard Access
Incorrect username or password.
Restricted Royal Sakti™ working tool. Contract and project information should only be uploaded by authorised users.
THE SAKTI SOLUTION™REPORT GENERATOR & LIVE RESULTS ENGINE
The Sakti Solution™ · Contract Intelligence

Contractual Risk Evidence Engine

Contract information establishes the governing rule. Project records establish what occurred. A risk finding is generated only when an evidenced deviation can be tested against a controlling contractual requirement.
01 · Contract Information
Locked Rules
02 · Project Evidence
Not Assessed
03 · Deviation / Trigger
Not Established
04 · Risk Finding
Undetermined
A

Contract Information — Reference Layer

Reference parameters define the contractual test. They are not evidence that a risk event has occurred.
Rule IDContract ParameterControlled Value / RequirementStatus
CRULE-01Time for Completion30 Sep 2026 — SIG/PSD LOA seedLOCKED
CRULE-02Delay LDRM33,405.57/day; application subject to the specified Key DatesLOCKED
CRULE-03Service Disruption LDRM30,000/hour where contractually attributableLOCKED
CRULE-04Programme RequirementDetailed schedule to conform to contractual Key DatesLOCKED
CRULE-05Notice / Claims MechanicsProject Conditions of Contract / Particular Conditions requiredVERIFY
B

Evidence Register — What Actually Happened?

Evidence IDSourceObserved Fact / Evidence StateStrengthRule Link
E-001P6 XERAwait uploaded schedule evidenceUNVERIFIEDCRULE-01 / 04
E-002MPR PDFAwait uploaded reported evidenceUNVERIFIEDCross-check
E-003Notice / CorrespondenceNo contractual notice evidence loaded in current sessionUNVERIFIEDCRULE-05
E-004Approved EOT / AmendmentNo controlled revision evidenced in current sessionUNVERIFIEDCRULE-01
C

Evidence-to-Risk Matrix

Risk IDEvidence Trigger RequiredContract TestRisk OutputCurrent Result
R-TIME-01P6 forecast exceeds locked completion date / applicable Key DateForecast vs contractual dateCompletion / LD exposureNOT TESTED
R-NOTICE-01Delay/change event + contractual notice recordActual notice timing vs controlling clauseNotice / time-bar exposureCOC REQUIRED
R-EOT-01Employer-risk event + critical-path effect + EOT statusRisk allocation + causation + complianceEntitlement preservationUNVERIFIED
R-INT-01Interface dependency failure evidenced in P6/MPRResponsibility vs actual constraintInterface exposureUNVERIFIED
R-CHANGE-01Instruction / scope delta + time or cost effectVariation mechanism + authority + complianceRecovery riskUNVERIFIED
R-TC-01Testing / commissioning prerequisite delayResponsibility + milestone dependencyRSD / completion exposureUNVERIFIED
D

Sakti Finding — Evidence Generated

No contractual-risk conclusion generated. Process project evidence first. Contract information alone does not constitute contractual risk.
E

Exposure & Required Action

FindingExposureConfidenceRequired Action
No evidenced findingNot calculated0% / UnverifiedProcess XER/MPR, then verify notices, EOTs and controlling clauses.
Analytical control: Contract Information ≠ Evidence. Evidence ≠ Liability. Responsibility, entitlement and time-bar conclusions require the controlling contract, causation analysis and appropriate professional review.
RS

ROYAL SAKTI™

STRATEGIC ADVISORY
PEOPLE
GOVERNANCE
INTELLIGENCE
PROTECTION
RECOVERY
GREATER VALUE

THE SAKTI SOLUTION™

RTS LINK

JOHOR BAHRU - SINGAPORE
ACTUAL STATUS ANALYSIS
EVIDENCE. INTERFACES. CERTAINTY.
"From complexity to certainty.
A more certain tomorrow."
- DEWI SAKTI
PROJECT VISUAL
Upload a verified project image in the calculator panel.
ProjectRTS Link
Johor Bahru - Singapore
TypeCross-border Rapid Transit System
LengthApprox. 4 km
Key StationsBukit Chagar / Woodlands North
Target RSD / Ops31 Dec 2026 / 1 Jan 2027
Key ObjectiveCross-border connectivity and growth
1
System Work Package Structure
BASED ON VERIFIED INPUT / LATEST DATA
WPCScopeStatusRemarks
Status is generated from the editable WPC register and should be validated against latest programme data.
2
Key Contractual Milestones
LATEST VERIFIED / CONTRACTUAL DATES
No.MilestoneDate
3
Key Stakeholders
4
Infra - System Interface
IF
Interface cutoff: 30 December 2025

5
Room Degree Finishes / Interface Readiness
TEMPLATE - ADAPT TO CONTRACTUAL DEFINITION
Category
Typical Rooms / Areas
Degree 1
Degree 2
Degree 3
A
Critical power, traction, battery and system rooms
Floor finishes; permanent doors; first coat
Second coat; raised floor; first and second fix
Final coat; works complete; site testing; cleaning & sealing
B
Communications, signalling, UPS, wash plant and maintenance areas
Floor finishes; temporary doors; first coat
Second coat; raised floor; first and second fix
Permanent doors; final coat; works complete; testing
C
Fare equipment, AFC and communication equipment rooms
Floor finishes; temporary doors; first coat
Second coat; raised floor; first and second fix
Final coat; all works; site testing; final cleaning
6
Overall Programme Status
INDICATIVE DECISION INTELLIGENCE
57%
Overall ProgressActual physical progress
AT RISK
Schedule StatusSPI 0.88
HIGH
Interface RiskCross-package dependencies
MONITOR
Cost StatusExposure under review
7
Key Challenges
8
Schedule Snapshot
KEY DATES
Completed   In Progress   At Risk   Not Started
9
The Sakti Solution™ Recommendations
    10
    Target Outcome
    ON TRACK RSDTarget 31 Dec 2026
    CONTROLLED COST & CLAIMSProtect capital
    SUCCESSFUL INTEGRATIONSystems & testing readiness
    SUSTAINABLE VALUEDecision confidence
    CONNECTING PEOPLE.
    POWERING TOMORROW.
    Executive Capital Protection Snapshot
    RM962.0M
    TCV
    73.8%
    Entitlement coverage
    RM146.5M
    Unprotected exposure
    RM2.57M
    Gross LAD risk
    85%
    Defensibility
    86/100
    Executive score